Anne & Greg’s kitchen
Before:
During:
After: new plumbing & electrical, under-cabinet lighting, additional bar and over-sink lighting, lower cabinet rebuild, added panel-ready dishwasher, new soapstone countertops, restored original wood flooring, restoration of vintage cast iron sink
Georgia’s extra room
Before:
After: removed trim, framed in new wall and door, installed matching vintage door and baseboard.
Kristen’s studio
Before:
After: replaced french doors with single door and window, replaced siding and trim with new redwood shiplap siding, paint
C’s laundry room
Before:
After: removed ceiling, moved electrical conduit, added beadboard, trim. new light fixture
Suzanne’s arbor
Before:
After:
Dustin’s steam shower
Before:
After complete remodel: concrete, plumbing, electrical, tile